24/7 emergency0472 657 042
Hills Plumbing & Gas
Inland
Ashmore, Gold Coast QLD

Bathroom Renovations in Ashmore

Established residential housing on town water and sewer. Hills Plumbing & Gas covers Ashmore for bathroom renovations, fixed-price quoting, 24/7 emergency, workmanship guarantee in writing.

Bathroom Renovations in an inland suburb like Ashmore

Ashmore's housing went up mostly between the 1970s and the 1990s, and a lot of those homes still carry their original bathrooms: the brown or pastel tiles, the shower over the bath, the vanity that was fashionable when it went in. Those bathrooms did their job for forty years and they are done. The good news about renovating in Ashmore rather than on the beachfront is that what sits behind the tiles is usually in fair shape. In-wall copper away from salt air tends to be sound, drainage under slab or timber floors is usually serviceable, and homes renovated or built after the waterproofing standards tightened generally have a membrane where one belongs. The genuinely old streets are the caveat: pre-1990 bathrooms often have no effective waterproofing at all, and 1970s homes can still hide galvanised water lines that should not survive the renovation. We strip, assess and rebuild with that vintage in mind, and everything from waterproofing certification to the final fit-off is documented.

Bathroom Renovations across Ashmore

Ashmore plumbers covering the residential streets between Southport and Nerang, from the older established homes near Ashmore State School and Ashmore City shopping centre, through to the newer estates toward Molendinar. The Ashmore Plaza precinct on Currumburra Road anchors daily activity, with Aquinas College and Aspire School in the catchment. Much of the housing stock dates back to the 1960s-90s brick-and-tile family-home era on quarter-acre blocks now well into renovation-refresh territory.

What we typically see in Ashmore specifically

Ashmore's housing skews 1960s-1990s, many homes are on their second or third hot water system now and starting to need full bathroom renovations as 30-50 year old original tilework reaches end-of-life. The older brick-and-tile homes often have ageing copper pipework with pinhole leaks developing at compression fittings, we re-pipe sections in PEX during renovations. Gas fitting work is common, Ashmore has strong mains gas coverage right through the suburb. The 1960s-70s streets near Ashmore State School often still have original galvanised hot-water lines that are well past serviceable life. Slightly lower-lying lots near the Nerang River and Saltwater Creek catchment occasionally need stormwater pit clearing after heavy rain.

How the bathroom renovations job runs in Ashmore

An Ashmore bathroom renovation runs three to five weeks from strip-out to final fit-off, with plumbing spread over roughly four visits:

  1. Strip-out and disconnection. Fixtures out, water isolated, and the first honest look at what forty years of use left behind the tiles.
  2. Assessment while the walls are open. Copper condition, any galvanised remnants, drainage falls, subfloor or slab condition. If something needs dealing with, this is the cheap moment to deal with it, and you get it in writing with a price before anything proceeds.
  3. Rough-in. New hot and cold in PEX as standard, copper if specified, new drainage where the layout changes, pressure tested before the walls close.
  4. Set-out coordination. We work to the tiler's and waterproofer's sequence, and the waterproofing is done by a licensed applicator and certified, which Queensland requires and which protects the single most failure-prone part of any bathroom.
  5. Fit-off and handover. Tapware, fixtures, toilet, testing, and the workmanship guarantee documented on the invoice.

Layout changes are where budgets move. Keeping the toilet, shower and vanity where they are keeps the plumbing simple. Moving a toilet or converting a bath-and-shower corner into a walk-in shower on a slab home means coring concrete and re-laying drainage with proper fall, and relocating a toilet or wet area adds $1,500 to $4,000 plus to the plumbing. Worth it when the layout is genuinely bad, worth skipping when it is vanity metreage; we will tell you which we think it is.

We can run plumbing only alongside your builder and trades, or run the whole renovation end to end through the small trade network we use across the central suburbs, one point of contact either way.

Why Ashmore homes call Hills Plumbing & Gas

  • We have opened up enough original Ashmore bathrooms to know what the 70s and 80s left in the walls
  • QBCC plumbing licence 15243081 plus a separate gas work licence, waterproofing certified by a licensed applicator
  • Fixed written quote, with strip-out discoveries priced in writing before work continues
  • One phone number for the whole renovation, answered by the plumber doing it
  • Workmanship guarantee documented on the invoice

Pricing for bathroom renovations in Ashmore

Ashmore renovation pricing, 2026. Plumbing scope only:

  • Straightforward renovation, same layout: quoted on inspection below the mid-tier band
  • Mid-range renovation with some layout adjustment: $6,000 to $9,000
  • Premium renovation or significant layout change: quoted on inspection, above the mid-tier band
  • Toilet or wet area relocation: adds $1,500 to $4,000 plus

Whole renovation, all trades:

  • Solid refresh: $18,000 to $25,000
  • Mid-range full renovation: $28,000 to $40,000
  • Premium renovation: $45,000 to $70,000 plus
  • Top-end work: runs to $120,000 plus

Hold a contingency of $2,000 to $3,000 for what strip-out reveals. In Ashmore that is usually modest, old galvanised remnants or a drainage surprise in the earliest streets, but the honest budget includes it. Outdoor showers and other add-ons are quoted on inspection.

Why Ashmore homes call Hills Plumbing & Gas

  • Gold Coast based, 13+ years experience on the tools, familiar with how Ashmore houses are usually plumbed
  • QBCC plumbing licence plus a gas work licence, full public liability cover, gas work compliance issued at the door
  • Quote in writing first, then the work, no "we hit something unexpected" add-ons
  • Out of hours we still pick up the phone, no "we will get back to you tomorrow"
  • Workmanship guarantee documented on every job sheet, no fine-print exclusions

Need bathroom renovations in Ashmore?

We will come out, see the job, and put a fixed price in writing.

Get a Ashmore quote
FAQs

Bathroom Renovations in Ashmore, common questions

Do I need a waterproofing certificate for a bathroom renovation?+
Yes. In Queensland, wet-area waterproofing must be done by a licensed waterproofer to AS 3740 and certified, and you should end up holding a written certificate naming the applicator, the membrane product and the date. On Ashmore's pre-1990 bathrooms this matters doubly, because the renovation is often installing the first real membrane the room has ever had. No certificate, no tiling, on any job we run.
How long will my bathroom reno take?+
Three to five weeks from strip-out to final fit-off for a typical Ashmore renovation, with plumbing on site for four or five days spread across that window. The sequence is fixed by cure times as much as trades: waterproofing and screeds cannot be rushed without buying a leak. We give you the week-by-week plan up front so the household can work around the one bathroom that is out of action.
Can I move the toilet during the reno?+
Yes. On Ashmore's slab-on-ground homes it means coring the slab and laying new drainage with proper fall, and it adds $1,500 to $4,000 plus to the plumbing. On the suburb's timber-floor homes it is often simpler. Whether it is worth it depends on what the move buys you; freeing up a wall for a double vanity often justifies it, shifting a toilet 300mm rarely does. We will give you a straight opinion with the quote.
Do you supply tapware or do I buy it?+
Either works. We hold trade pricing across the mainstream and premium brands and pass on the benefit, or you supply your own and we fit it, with one caveat: tell us the model before rough-in. Wall-mounted mixers and freestanding bath fillers need their plumbing in exactly the right place behind the wall, and confirming the fitting first is free, while moving pipework after tiling is not.
What will a renovation of an original 1970s or 80s Ashmore bathroom cost?+
For the plumbing scope, quoted on inspection, below the mid-tier band keeping the same layout, $6,000 to $9,000 with some layout adjustment, and a quote on inspection for premium or significantly reworked rooms. As a whole-renovation figure with all trades, a solid refresh runs $18,000 to $25,000, mid-range $28,000 to $40,000, and premium work $45,000 to $70,000 plus. Original-condition rooms sit comfortably within these ranges more often than people fear; the vintage mostly changes what we check, not what you pay.
Will you find nasty surprises behind my original Ashmore tiles?+
Less often than the renovation shows would have you believe. Ashmore's inland copper is usually sound and the drainage usually serviceable. The two genuine risks in this suburb are pre-1990 rooms with no effective waterproofing, which the renovation fixes by definition, and galvanised water lines in the oldest streets, which should be replaced while the walls are open. Hold $2,000 to $3,000 contingency; most of our Ashmore jobs hand it back.
Can we renovate the ensuite and main bathroom at the same time?+
Yes, and doing them together is cheaper than doing them a year apart, because the trades mobilise once and the plumbing rough-ins share visits. The catch in a family home is losing both bathrooms at once, so we usually stagger the strip-outs so one shower stays usable for all but a few unavoidable days. If the household can weather it, back to back is the efficient way to clear forty years of bathroom in one hit.

Need bathroom renovations in Ashmore?

Fixed-price quoting, 24/7 emergency, workmanship guarantee.

Call 0472 657 042Get a Quote